101 GEORGE STREET

Project Overview

Client: Greystar
Location: London
Contract Value: £20 million
Sector: Residential / Build-to-Rent

Accord Engineering delivered a complex façade package for the prestigious 101 George Street development, incorporating premium materials and high-quality architectural finishes.

Scope of Works

Accord Engineering provided the full design, supply and installation of:

  • Dark green glazed terracotta cladding
  • Aluminium windows and curtain walling
  • Metal cladding systems
  • Vertical architectural feature fins
  • GRC cladding elements
7

The Challenge

This project demanded exceptional attention to detail, precise alignment of materials, and flawless finishing to achieve the architect’s vision.

Key challenges included:

  • Managing complex façade interfaces
  • Delivering consistent finishes across elevations
  • Coordinating multiple materials and systems

Our Solution

Our in-house team delivered a fully coordinated façade solution, ensuring:

  • Accurate detailing and manufacturing
  • Seamless integration between systems
  • High-quality finishes across all elevations

Close collaboration with the client and wider project team ensured smooth delivery and exceptional results.

7

The Result

The completed development features a distinctive architectural aesthetic, combining premium materials with robust engineering solutions. The project stands as a showcase of Accord Engineering’s expertise in delivering high-end façade systems.

Services Used:

  • Architectural Metalwork
  • Curtain Walling
  • Aluminium Windows
  • GRC Cladding
  • Metal Cladding