101 GEORGE STREET
Project Overview
Client: Greystar
Location: London
Contract Value: £20 million
Sector: Residential / Build-to-Rent
Accord Engineering delivered a complex façade package for the prestigious 101 George Street development, incorporating premium materials and high-quality architectural finishes.
Scope of Works
Accord Engineering provided the full design, supply and installation of:
- Dark green glazed terracotta cladding
- Aluminium windows and curtain walling
- Metal cladding systems
- Vertical architectural feature fins
- GRC cladding elements
The Challenge
This project demanded exceptional attention to detail, precise alignment of materials, and flawless finishing to achieve the architect’s vision.
Key challenges included:
- Managing complex façade interfaces
- Delivering consistent finishes across elevations
- Coordinating multiple materials and systems
Our Solution
Our in-house team delivered a fully coordinated façade solution, ensuring:
- Accurate detailing and manufacturing
- Seamless integration between systems
- High-quality finishes across all elevations
Close collaboration with the client and wider project team ensured smooth delivery and exceptional results.
The Result
The completed development features a distinctive architectural aesthetic, combining premium materials with robust engineering solutions. The project stands as a showcase of Accord Engineering’s expertise in delivering high-end façade systems.
Services Used:
- Architectural Metalwork
- Curtain Walling
- Aluminium Windows
- GRC Cladding
- Metal Cladding
